Keyphrases
Fast Charger
100%
Single-stage
100%
Medium Voltage
100%
Power Module
50%
Power Density
50%
Switching Frequency
50%
Multiple Performance Criteria
50%
Power Conversion Stage
50%
Charging Station
50%
Soft Switching
50%
Optimal Switching
50%
Power Reliability
50%
High Frequency Magnetics
50%
Exploration Tool
50%
Converter Design
50%
Solid State Transformer
50%
FREEDM
50%
System Losses
50%
Switching Trajectory
50%
Electric Vehicle
50%
DC Load
50%
Voltage Power
50%
Saturable Inductor
50%
Analytical Representation
50%
EV Owners
50%
System Installation
50%
Size Efficiency
50%
Switching Transition
50%
Transformer Technology
50%
Design Space Exploration
50%
Optimized Modulation Strategy
50%
Switching Devices
50%
Single-stage Power Conversion
50%
Review Criteria
25%
System Cost
25%
Medium Voltage Distribution Network
25%
Efficiency Improvement
25%
Cost Efficiency
25%
EV Charger
25%
Electric Vehicle Charger
25%
EV Charging Infrastructure
25%
Step-down
25%
Design Parameters
25%
System Efficiency
25%
System Size
25%
Power Conversion
25%
Phase Shift
25%
Transformer
25%
Fast Charging
25%
Power Consumption
25%
Charging Process
25%
Analytical Model
25%
US Power
25%
Advanced Technologies
25%
Controller
25%
Commercial Potential
25%
Impact Review
25%
Engineering
Solid State Transformer
100%
Power Conversion
100%
Power Stage
100%
Electric Vehicle
100%
Electric Power Utilization
50%
Design Space
50%
Distribution System
50%
System Efficiency
50%
Charging Process
50%
Improve Efficiency
50%
Soft-Switching
50%
Switching Frequency
50%
Cost Efficiency
50%
Analytical Model
50%
Modulation Scheme
50%
System Cost
50%
Design Parameter
50%
Phase Shift
50%
Power Converter
50%
Size System
50%
Power Density
50%
Performance Criterion
50%